top of page

Catbalogan City Hall

Project Information


Status

Construction


Location

Samar, Philippines


Area

28,000 sqm

Description


CATBALOGAN SKY CITY MEGA PROJECT 

Sky City Mega Project is a 440 hectare mixeduse mountaintop development project that aims to be a model of sustainability to the country. Due to its low lying coastal geography and mountainous landscape, the city of Catbalogan is at risk from natural hazards such as landslides, floods, and storms. Additionally, the steadily increasing population has put a strain on resources, property, and the infrastructure. Sky City aims to tackle these issues as it will be built 120 meters above sea level, creating opportunities for development while being naturally sheltered by the mountain ranges. It will be designed to include residential, commercial, and governmental cores that will be powered from renewable sources, and will be planned together with pedestrian and cyclist friendly spaces to reduce transport emissions. 


SKY CITY HALL 

The Sky City Hall will be the new city hall in Catbalogan. The project will take up 2 hectares of the 440-hectare Sky City development. It will serve as an expansion from the current city hall with a goal to masterplan and pioneer mountaintop sustainable living as a model for future developments. Locating the main City Hall at a higher terrain will also minimize the risk of floods and encourage the complete expansion of the new city.


PROJECT DRIVERS 

The concept for the Sky City Hall is driven by four objectives. It aims to encourage public participation and transparency by designing spaces that result in heightened interconnectivity between the government and society. It celebrates socio-cultural identity by incorporating cultural symbolism in architectural elements and by encouraging social interactions through public spaces. The city hall seeks to enhance community connections, fostering a sense of belonging by including locals of all skill backgrounds in the creation and development of the new city hall. Lastly, it reflects and responds to local biodiversity by working with the existing terrain and using native species to further mitigate environmental degradation. 


COMMUNAL CORE 

Having direct access to communal spaces for everyone to use reflects the government’s priorities in increasing civic trust and public participation. The central spine achieves this by connecting public and private areas on a clear route, thus creating a sense of interconnectivity between government staff and visitors.

  • Instagram
  • Facebook
  • LinkedIn

2022

Museo Pambata Reading Corners

Saint Scholastica Chapel

Manila City Hall

New Taipei City Museum of Art

Trece Martires City Hall

Ferdinand E. Marcos Presidential Library

Tagaytay City Hall

Philippine International Exhibition Center

Merit Field Stupa

Church of the Multitude

DSWD Elderly and Child Care Facility

Chinese Embassy Cultural Section

Supreme Court

Sulong Manila

Taichung Cultural Center

Balanga City Hall

Varna Library

Guggenheim Helsinki

Bataan Provincial Capital Masterplan

Highlands Chapel

bottom of page